Drainage & Base Work
Drainage & Base Work
Why water, subgrade, aggregate, compaction, and deliberate slope determine whether a court stays level and durable after the color coat goes on.
Why Courts Fail From Water First
How surface drainage, subgrade water, low spots, edge conditions, and poor base preparation cause puddling, cracking, movement, and premature court failure.
Read article →
Base and Compaction Before Color
Why subgrade preparation, aggregate depth, moisture, lift placement, compaction testing, slope, and drainage come before concrete, acrylic color, or sport tile.
Read article →
Ready to plan the real thing?
Send a project request and work directly with our team on your site, scope, and construction quote.